Verdant is a five-story income restricted apartment building with 82 units. The building core loop is heated with high efficiency gas fired boilers and cooled with a fluid cooler. Common areas and individual units are then heated and cooled with high efficiency water source heat pumps. An energy recovery ventilator provides controlled and conditioned outside air to the building using exhaust air. This passive house project is 90% more efficient than standard buildings.

High efficiency boiler installation at passive house construction